PENG Contract Tab

From Emprise Wiki
Jump to: navigation, search

Contract Info Tab

PENG-Contract-Contract Info Tab.png

Business Rules

  • Work Packages designated as a Primary Contract will have the Dates & Milestones Tab enabled for view and edits.
  • Work Packages without a Primary Contract designation will have the Dates & Milestones Tab enabled for viewing only.

Add Port Engineer

Success

Type/Dropdown Field

PENG-Contract-Contract Info Tab-Add Port-Engineer Dropdown.png

Autocomplete

PENG-Contract-Contract Info Tab-Add Port-Engineer Autocomplete.png

Successful Selection

PENG-Contract-Contract Info Tab-Add Port-Engineer Success.png

Error

Invalid Input

PENG-Contract-Contract Info Tab-Add Port-Engineer Failed Autocomplete.png

Error Message

PENG-Contract-Contract Info Tab-Add Port-Engineer Error Message.png


Business Rules: Port Engineer Dropdown Selection

  • Users can only select an option from the dropdown menu.

Autocomplete

  • When an Autocomplete fails an error message will be displayed to the user.
  • The error message is triggered when a user clicks on the error icon presented in the field or when an attempt is made to tab or select the next control or field.


Dates & Milestones Tab

PENG-Contract-Dates and Milestones Tab.png

General Section Fields

Field Field Type Default State Notes
Scheduled Start Date Date Picker Disabled
Scheduled End Date Date Picker Disabled
Scheduled Duration Input Field Read-Only
  • Set/confirm the data element for Scheduled Duration is Scheduled Start Date - Scheduled End Date in days when Scheduled Start date = Scheduled End date, then duration value shall return 1 day.
Revised Start Date Date Picker Enabled
  • Value displayed is the latest entry for Revised Date of the Start Availability Milestone for the selected POAM type, located in the Edit Availability Modal.
Revised End Date Date Picker Enabled
  • Value displayed is the latest entry for Revised Date of the Complete Availability Milestone for the selected POAM type, located in the Edit Availability Modal.
Revised Duration Input Field Read-Only
  • Set/confirm the data element for the Revised Duration is Revised Start Date - Revised End Date in days when Revised Start date = Revised End date, then duration value shall return 1 day 
Actual Start Date Date Picker Read-Only
  • Value displayed is the Completion Date of the Start Availability Milestone for the selected POAM type, located in the Edit Availability Modal.
Actual End Date Date Picker Read-Only
  • Value displayed is the Completion Date of the Complete Availability Milestone for the selected POAM type, located in the Edit Availability Modal.
Actual Duration Input Field Read-Only
  • Set/confirm the data element for the Actual Duration is Actual Start Date - Actual End Date in days when Actual Start date = Actual End date, then duration value shall return 1 day 

Milestone Grid Icons

Value Alt Text Location Emerging Screen Notes
Add New Add Custom Milestone Grid Toolbar Add Custom Milestone Dialog
  • Newly created custom Milestones default as the first selection and upon completion of the Due Date, the custom Milestone shall appear in chronological order by Due Date.
  • Users with permission canaddcustommilestone can add Custom Milestones to the Milestone grid.
Export Export Milestones Grid Toolbar Export Grid Dialog -
Print Report Print Report Grid Toolbar - -
Notes Launch POAM Notes Notes Grid Column Notes Dialog
  • Tooltip text displayed upon mouse hover "Launch POAM Notes"
Delete Delete Custom Milestone. Delete Icon Column Are you sure? Dialog
  • Only Custom Milestones can be deleted from the Milestone Grid.

Completion Dates

PENG-Contract-Dates and Milestones Tab-Completion Dates.png

In-line Editing

PENG-Contract-Dates and Milestones Tab-In-line Editing.png

Business Rules

  • Apply caneditduedate to all Type Desk roles upon implementation via a script, this permission can only change the Due Dates for Planning Milestones and Execution Milestones on the Milestone grid.

Multi-Column Sorting

PENG-Contract-Dates and Milestones-Multi-Sort.png

Confirmation Dialog

PENG-Contract-Dates and Milestones-Multi-Sort-Inform Modal.png

Multi-Select

PENG-Contract-Dates and Milestones Tab-Multi Select.png

Add Custom Milestone

PENG-Contract-Dates and Milestones Tab-Add Custom Milestone.png

Date Conflict Dialog

PENG-Contract-Dates and Milestones Tab-Add Custom Milestone-Date Conflict.png

Business Rules

  • The Milestone Date Conflict dialog emerges when the Planning Milestone Due Date entered is before the Availability Start Date.
  • The Milestone Date Conflict dialog emerges when the Execution Milestone Due Date entered is after the Availability Start Date.
  • The Milestone Date Conflict dialog emerges when the Post Availability Milestone Due Date entered is no longer after the Availability End Date.

Business Rules

General

  • Availability Start dates cannot be after Availability End dates in all cases Scheduled, Revised and Completion. If the user tries to save dates not in compliance with these business rules, an alert dialog will emerge with an error message "Start date can not be later than End date and End date cannot be earlier than Start date.". Footer will have a button with the text "Ok".
  • The Original Date is logged into the Original Date column in the Revisions area after a change is made to the Due Date or Completion Date.
  • End Dates cannot come before Start Dates in any of the three locations (Scheduled, Revised, and Actual).
  • Notes are required if the Completion Date being entered is past the Revised Date and/or the Due Date.
  • If the Estimated Start Date or Estimated End Date changes, the system will update the Due Date for all POAM item(s) with a null Revision Date and Completion Date.
  • The Time Progress percentage value in the Progress Module, will reference the Revised End Date for calculation.
    • If the Revised End Date is Null/Blank, the calculation will use the Scheduled End Date.
  • The Actual Completion Date field is disabled until the a value for the Actual Start Date field is selected.
  • The Actual Completion Date and Scheduled End Date cannot be earlier than the Scheduled Start Date or Actual Start Date.
  • The Scheduled Start Date cannot be later than the Scheduled End Date.


Tooltips

Header Tooltip
Scheduled Start "Scheduled Start Date, Scheduled End Date, Award Date and Duration values are only editable from the Availabilities Edit Work Package screen."
Scheduled End
Award Date
Duration Values

Milestone Rules

  • Planning Milestones and Execution Milestones groups on the Milestone grid are in a collapsed view by default.
  • The Print Report & Export Milestones functionality, will display the report with the first tab titled "Planning, Execution and Post Availability Milestones" all Milestones listed will be in chronological order, the second tab is titled Planning Milestones, the third tab is titled Execution Milestones and the fourth Post Availability Milestones each featuring their own data elements.
  • All Custom Milestones and their associated values (Milestone Title, Due Date, Revised Date, Completion Date, Notes) are available for edit.
  • All other Milestones and their associated values are read only.
  • All current and future Milestones whether system generated or custom inputted will appear as all capital letters. They are later used in the PENG->Situation Report which requires all capital letters for Navy Message submission.
  • If the Estimated Start Date changes, the system will update the category of any Custom Planning, Execution or Post Availability category Milestones in keeping with the Custom Milestone business rules.

Multi Column Sorting Rules

  • The Multi-Column Sorting functionality is activated when a user press and hold the Shift key button, and selects multiple columns.
  • A confirmation dialog is triggered when a user releases the Shift key button upon selecting multiple columns.
  • Any Milestone(s) with a date between the Scheduled Start Date and Scheduled End Date shall be included in the Situation Report.

Milestone Values

150 Day Milestone Values

Value Milestone Type Notes
ISSUE ADVANCE PLANNING LETTER (OPCO ISSUE IAW C-2.5.7.2.3.) Planning Milestones
  • Read Only
ISSUE SOLICITATION (OPCO IAW C-2.5.7.2.8.) Planning Milestones
  • Read Only
OFFERORS SHIP CHECK OF VESSEL (SEC L-5). PPE TO ATTEND / ACO OPTIONAL Planning Milestones
  • Read Only
SOLICITATION CLOSES Planning Milestones
  • Read Only
COMPLETE TECH / PRICE EVALUATION OF INITIAL PROPOSAL Planning Milestones
  • Read Only
CONTRACT AWARD Planning Milestones
  • Read Only
PPE NOTIFY ABS AND USCG (if required) Planning Milestones
  • Read Only
START AVAILABILITY Planning Milestones
  • Upon Save, an Alert Dialog emerges when a date change has occurred for the Revised or Completion Dates fields on the Milestone grid.
  • PENG-Contract-Save Alert-Revised Completion Date.png
AVAILABILITY COMPLETION REPORT - REF. AND EXECUTE MSFSC INSTRUCTION 5224.2A Planning Milestones
  • Read Only
PPE BEGIN WORK PACKAGE DEVELOPMENT Planning Milestones
  • Read Only
PPE AND/OR SSU PRESIDING PORT ENGINEER FORWARD PRELIMINARY WORK PACKAGE TO SHIP FOR REVIEW Planning Milestones
  • Read Only
ALL CODES AND SHIP FORCE SUBMIT WORK PACKAGE REVIEW COMMENTS TO PPE Planning Milestones
  • Read Only
PPE AND/OR SSU PRESIDING PORT ENGINEER COMPLETE JOINT WORK PACKAGE REVIEW. FINAL WORK PACKAGE ASSEMBLED Planning Milestones
  • Read Only
PPE ORDERS GOVERNMENT FURNISHED MATERIAL IF REQUIRED. Planning Milestones
  • Read Only
FINAL WK PKAGE DUE FOR REVIEW (OPCO IAW C-2.5.7.2.8):FINAL INDEX WORK ITEMS DWGS/TECH MANUALS EST GFM/OFM LIST & OTHER REFS Planning Milestones
  • Read Only
SHIP GFM IF APPLICABLE Planning Milestones
  • Read Only
MACHINERY SPACE TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus nine calendar days.
  • Read Only
PRE START UP MEETING Execution Milestone
  • Due Date is Availability Completion Date minus seven calendar days.
  • Read Only
BRIDGE TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus seven calendar days.
  • Read Only
CREW MOVE ONBOARD Execution Milestone
  • Due Date is Availability Completion Date minus six calendar days.
  • Read Only
DOCK TRIAL Execution Milestone
  • Due Date is Availability Completion Date minus four calendar days.
  • Read Only
HABITABILITY, GALLEY AND MESS TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus four calendar days.
  • Read Only
SEA TRIAL Execution Milestone
  • Due Date is Availability Completion Date minus two calendar days.
  • Read Only
COMPLETE AVAILABILITY Planning Milestones
  • Upon Save, an Alert Dialog emerges when a date change has occurred for the Revised or Completion Dates fields on the Milestone grid.
  • PENG-Contract-Save Alert-Revised Completion Date.png

381 Day Milestone Values

Value Milestone Type Notes
ISSUE ADVANCE PLANNING LETTER (OPCO ISSUE IAW C-2.5.7.2.3.) Planning Milestone
  • Read Only
PPE IDENTIFY AND BEGIN ORDERING LLTM (NOTE: RDD TO MSC/OPCO WAREHOUSE NLT A-45 AWARD MILESTONE) Planning Milestone
  • Read Only
SMT ADV PLANNING WORK SCOPE CONF ON VESSEL. PPE CONDUCT SMT QTLY MTG VRR SHIPCHECKS PEVI (OPCO IAW C-2.5.7.2.4.) Planning Milestone
  • Read Only
CUT-OFF DATE FOR SUBMITTAL OF PRIORITIZED NON-CRITICAL VRRs Planning Milestone
  • Read Only
PRE-OVHL BRIEF WITH TYPE DESK. PPE DISCUSS ASSEMBLED INITIAL PACKAGE ESTIMATES AND REG BODY REQUIREMENTS. Planning Milestone
  • Read Only
INITIAL WK PKG DOCUMENTS DUE FOR REVIEW: INDEX WK ITEMS CDRLS J&A. SUBMIT TO: N10 N00L N02 [FOR DD-254] N44 [GFM] & SHIP Planning Milestone
  • Read Only
N10/FLC POST SYNOPSIS TO FEDERAL BUSINESS OPPORTUNITIES Planning Milestone
  • Read Only
CUT OFF DATE FOR MISSION OR SAFETY CRITICAL VRRs AND CASREPS. PPE TO VALIDATE NEED FOR PACKAGE ADDENDUM Planning Milestone
  • Read Only
N10/FLC APPROVE SOURCE SELECTION PLAN AND PROVIDES TO SOURCE SELECTION TEAM Planning Milestone
  • Read Only
ISSUE SOLICITATION (OPCO IAW C-2.5.7.2.8.) Planning Milestone
  • Read Only
OFFERORS SHIP CHECK OF VESSEL (SEC L-5). PPE TO ATTEND / ACO OPTIONAL Planning Milestone
  • Read Only
N10/FLC ISSUE LAST WORK PACKAGE ADDENDUM Planning Milestone
  • Read Only
FINAL DATE FOR OFFEROR REQUESTS FOR CLARIFICATION (SEC L-3) Planning Milestone
  • Read Only
SOLICITATION CLOSES Planning Milestone
  • Read Only
BEGIN TECHNICAL / PRICE EVALUATION OF INITIAL PROPOSALS Planning Milestone
  • Read Only
COMPLETE TECH / PRICE EVALUATION OF INITIAL PROPOSAL Planning Milestone
  • Read Only
N10/FLC CONTRACT REVIEW BOARD (CRB) OF PRE-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) Planning Milestone
  • Read Only
PCO SUBMIT PRE-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) TO N10 FOR APPROVAL Planning Milestone
  • Read Only
N10/FLC APPROVE PRE-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) Planning Milestone
  • Read Only
SEND ITEMS FOR NEGOTIATION (IFNs) TO OFFERORS Planning Milestone
  • Read Only
CONDUCT NEGOTIATIONS WITH OFFERORS Planning Milestone
  • Read Only
RECEIVE FINAL PROPOSAL REVISIONS (FPRs) Planning Milestone
  • Read Only
COMPLETE TECHNICAL / PRICE EVALUATION OF FINAL PROPOSAL REVISIONS (FPRs) Planning Milestone
  • Read Only
SUBMIT POST-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) TO N10 FOR APPROVAL Planning Milestone
  • Read Only
N10/FLC APPROVE POST-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) Planning Milestone
  • Read Only
SUBMIT UPDATED/REVISED FUNDING REQ TO N8 FOR FUND CERTIFICATION. N8 TO NOTIFY N10. Planning Milestone
  • Read Only
MASTER SUBMIT MANNING CREW RETENTION REQUIREMENT TO PORT CAPTAIN / PROGRAM MANAGER; FOR OPC MEETING Planning Milestone
  • Read Only
CHIEF ENGINEER SUBMIT SHIPS FORCE WORK LIST (SFWL) TO PORT CAPTAIN / PORT CHENG / PROGRAM MANAGER / PPE; FOR OPC MEETING Planning Milestone
  • Read Only
SEND 5 DAY LETTER TO SMALL BUSINESS (SB SET-ASIDE ONLY) Planning Milestone
  • Read Only
SUBMIT CHINFO PRESS RELEASE Planning Milestone
  • Read Only
CONTRACT AWARD Planning Milestone
  • Read Only
OPERATIONAL PLNG COMMITTEE (OPC) MTG. DISCUSS WK PKG IMPACTS/CREW RETENTION AND MANNING/S&Q/SHIP FORCE SUPPORT & WK LIST RQMNTS Planning Milestone
  • Read Only
DELIVER GFM/OFM FROM MSC/OPCO TO SHIPYARD (NOTE: ALL GFM/OFM TO SHIPYARD PRIOR TO START DATE) (OPCO IAW C-2.5.7.2.12.) Planning Milestone
  • Read Only
AWARD S AND Q CONTRACT (as required) Planning Milestone
  • Read Only
START AVAILABILITY Planning Milestone
  • Upon Save, an Alert Dialog emerges when a date change has occurred for the Revised or Completion Dates fields on the Milestone grid.
  • PENG-Contract-Save Alert-Revised Completion Date.png
AVAILABILITY COMPLETION REPORT - REF. AND EXECUTE MSFSC INSTRUCTION 5224.2A Planning Milestone
  • Read Only
UPDATE PENG REGISTER AND INITIATE CPARS PROCEDURE Planning Milestone
  • Read Only
SUBMIT POST OVERHAUL COMPLETION REPORT TO TD; INCLUDE TALT COMPLETION REPORT (DOCUMENTED IN TALT-SHIP) (OPCO IAW C-2.5.7.5.7.) Planning Milestone
  • Read Only
CONDUCT POST OVERHAUL MEETING Planning Milestone
  • Read Only
PPE BEGIN WORK PACKAGE DEVELOPMENT Planning Milestone
  • Read Only
ALL CODES AND SHIP FORCE SUBMIT WORK PACKAGE REVIEW COMMENTS TO PPE Planning Milestone
  • Read Only
FINAL WK PKAGE DUE FOR REVIEW (OPCO IAW C-2.5.7.2.8):FINAL INDEX DWGS/TECH MANUALS EST GFM/OFM LIST & OTHER REFS Planning Milestone
  • Read Only
SUBMIT WORK PACKAGE FUNDING REQ TO N8 FOR FUND CERTIFICATION. N8 FUND CERTIFY AND NOTIFY N10 Planning Milestone
  • Read Only
MACHINERY SPACE TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus nine calendar days.
  • Read Only
PRE START UP MEETING Execution Milestone
  • Due Date is Availability Completion Date minus seven calendar days.
  • Read Only
BRIDGE TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus seven calendar days.
  • Read Only
CREW MOVE ONBOARD Execution Milestone
  • Due Date is Availability Completion Date minus six calendar days.
  • Read Only
DOCK TRIAL Execution Milestone
  • Due Date is Availability Completion Date minus four calendar days.
  • Read Only
HABITABILITY, GALLEY AND MESS TURN OVER Execution Milestone
  • Due Date is Availability Completion Date minus four calendar days.
  • Read Only
SEA TRIAL Execution Milestone
  • Due Date is Availability Completion Date minus two calendar days.
  • Read Only
COMPLETE AVAILABILITY Planning Milestone
  • Upon Save, an Alert Dialog emerges when a date change has occurred for the Revised or Completion Dates fields on the Milestone grid.
  • PENG-Contract-Save Alert-Revised Completion Date.png
INITIATE ADVANCE PLANNING PROCESS Planning Milestone
  • Read Only
PPE REVIEW ABS/USCG SURVEY STATUS FOR REQUIRED MAINTENANCE ACTIONS (PM AND CM) DURING AVAILABILITY Planning Milestone
  • Read Only
SHIP FORCE SUBMIT INITIAL PRIORITIZED VRR LIST TO PPE FOR AVAILABILITY PACKAGE CONSIDERATION. Planning Milestone
  • Read Only
PPE CNDCT PLANNING/SCOPING CONF W/STAKEHOLDERS(OPCO/PM/TD/CLS ENGR/N44/N64/N72/N75/N10/AIT/SPONSOR). N72 ADVISE ON TALT STATUS Planning Milestone
  • Read Only
PM CONFIRMS M&R BDGT ALLOWANCE INCLUSIVE OF OUTSIDE AGENCY FUNDING. PM CONFIRMS VESSEL ASSESSMENT DATES AND BIDDER SURVEY DATE Planning Milestone
  • Read Only
PPE SCHED PRE-AVAIL MATERIAL CONDITION ASSESSMENTS AS FOUND REQ'D FROM PPE SHIPCHECK/PEVI (IE: UT PRESERVATION THERMO OEM Etc) Planning Milestone
  • Read Only
RECEIVE ALL EXTRNL WK RQSTS N64 SUBMIT 400 SWBS WK ITEMS/N72 SUBMIT T-ALT WK PKGS/SPNSR & AGENCY AITs SUBMIT 700 SWBS WK PKGES Planning Milestone
  • Read Only
TYPE DESK / LCE WORK PACKAGE REIVEW COMPLETE. COMMENTS TO PPE FOR WORK PACKAGE REVISIONS. Planning Milestone
  • Read Only
SUBMIT PRESERVATION PAINT WORK ITEMS TO N71 COATINGS SUBJECT MATTER EXPERT FOR REVIEW Planning Milestone
  • Read Only
LTD PROVIDE GOVERNMENT FURNISHED PROPERTY (GFP) LIST AND DELIVERY STATUS TO PPE AND LOAD TO PIEE (NOTE: RDD TO MSC WAREHOUSE NLT Planning Milestone
  • Read Only
SUBMIT FINAL CHECKLIST SIGNED BY TYPE DESK. SUBMIT TO: N10/FLC AND N00L. (ALL WK ITEMS AND IGEs SHALL BE ENTERED INTO PENG) Planning Milestone
  • Read Only
FLC/N10/LEGAL FINAL PACKAGE REVIEW COMPLETE. N10/FLC NOTIFY PPE/OPCO WORK PACKAGE IS READY FOR SOLICITATION. Planning Milestone
  • Read Only
ISSUE FINAL PLANNING LETTER (INCLUDE UPDATED POAM TO REFLECT COMPLETED AND REVISED MILESTONES) Planning Milestone
  • Read Only
CUT OFF DATE FOR SUBMITTING MISSION OR SAFETY CRITICAL VRR/CASREP WORK PACKAGE ADDENDUM TO N10 Planning Milestone
  • Read Only
PPE CONDUCT MEETING WITH ABS / USCG LIAISONS TO DISCUSS SURVEY PLANNING Planning Milestone
  • Read Only
PPE SUBMITS CORRECTED WORK PACKAGE ADDENDUM ADDRESSING OFFEROR SPEC CLARIFICATION QUESTIONS Planning Milestone
  • Read Only
N10/FLC CONTRACT REVIEW BOARD (CRB) OF POST-NEGOTIATION BUSINESS CLEARANCE MEMO (BCM) Planning Milestone
  • Read Only
N10/FLC ACO & PPE CONDUCT POST AWARD PLANNING CONFERENCE Planning Milestone
  • Read Only

Contract Status Tab

PENG-Contract-Contract Status Tab.png

Business Rules

  • Changing the values in these fields the Award Labor Rate, AGR Labor Rate, G & A%, Profit%, Awarded AGR Labor Hours, AGR Material $, and the Tot. Funding $ column; will result in an automatic recalculation.

Total Expenditures Grid Column Header Tooltips

Column Header Tooltip Read-only
Project Code NA x
Task Code NA x
Expenditure Type Value chosen in WI Details x
Tot. Funding $ Total Contract Award Price
Awarded WI Cost Sum of all WI Costs equals the Cat A Bid Price x
Settled CCO Cost AGR Used + Credit Amount = the Total of all Settled CCO Cost items x
Total Expended Sum of Award WI Cost and Settled CCO Cost x
Available $ Difference Between Total Funding and Total Expended x
Est Unsettled CCO $ Sum of all Open, Issues, and In Negotiation Status CCO items x


AGR Activity Tab

PENG-Contract-Contract Status Tab-AGR Activity Tab.png


General Business Rules

  • Upon entry of values for the AGR Activity Tab, only one file is permitted for upload.
    • The Date and User columns on the AGR Activity Grid are auto-populated with the current date and the name of the user that entered and saved the values.
    • Users can download attachments from the AGR Activity grid by clicking on the attachment icon from the attachment column.
  • The Grid Columns for the AGR Activity Tab can not be sorted.
  • The Date column on the AGR Activity Tab grid displays the date entries from newest to oldest in descending order.

OMT Tab

PENG-Contract-OMT Tab.png

Add OMT Personnel

PENG-Contract-OMT Tab-Add OMT Personnel.png

Remove OMT Personnel

PENG-Contract-OMT Tab-Remove Personnel.png

Business Rules

  • A single click on a row on the OMT Tab Items Grid will make the fields editable.
  • After making changes to the OMT tab and attempting to navigate away from the tab, users shall be prompted to Save via the standard "Save Changes" dialog.

Unsaved Changes

  • Users are presented with the Unsaved Changes prompt if attempting to navigate away before saving.

PENG-Universal-Unsaved Changes Prompt.png